MEP ENGINEERING

Technical notes

Recurring design and permit topics; company articles.

MEP ENGINEERING
01

Before filing an application it pays to recalculate the balance — the peak often drops through organisation alone.

02

Balance, make-up air and duct routing all have to be settled before the architecture is frozen.

03

Fall, stack position, waterproofing and liability towards neighbours.

04

Savings come from schedules and shutdowns, not from attractive screens.

05

Test records, cause-and-effect matrix and a staff instruction are the minimum set.