SERVICE · ELECTRICAL

Electrical

We calculate the load and prepare documentation for technical conditions from the utility.

MEP ENGINEERING
Scope

Load balance

Utility technical condition documents

Single-line diagram (IEC 61439)

Cable sizing

Lighting EN 12464-1, DIALux

Earthing and lightning protection

Deliverables

Load calculation report

Single-line diagram

Panel schedules

Cable schedule

Lighting calculations

Bill of quantities

Standards

IEC 61439

EN 12464-1

Typical problems we solve
01

Allocated capacity is lower than required

Existing transformer and line capacity may not cover load growth; a utility application is needed early in design.

02

Generator and UPS — what gets connected

Without a clear critical load list and transfer logic at design stage, site cabling becomes chaotic.

03

Office lighting is tiring

Uniform lighting and wrong colour temperature cause eye strain; DIALux checks levels and uniformity.

FAQ

Who do we approach for capacity?

In Georgia, the regional utility; technical condition documents are submitted with the load calculation and single-line diagram.

Do you design solar PV?

Roof loading, inverter location, and grid connection point are coordinated with the electrical design; we flag when a dedicated PV specialist is needed.

How often are boards inspected on site?

Under site supervision, panel installation, labelling, and earthing connections are checked at critical stages.

Process

01

Survey and existing conditions review

02

Concept and system selection

03

Detailed design and cross-discipline coordination

04

Permit documents and official approvals

05

Tender documentation support

06

Construction-phase technical support

07

Commissioning and testing

08

Handover and as-built documentation