SERVICE · HVAC

HVAC

We calculate loads on real operating profiles, not catalogue defaults.

MEP ENGINEERING
Scope

EN 12831 heat load calculations

Heating scheme design

Ventilation and heat recovery

VRF and chiller plant design

Kitchen extract systems

Acoustic and noise control

Deliverables

Load calculation report

Layout plans

Plant room design

Equipment schedule

Bill of quantities

Balancing specifications

Standards

EN 12831

EN 13779

ASHRAE 62.1

Typical problems we solve
01

Not enough ceiling void for ductwork

Duct routing depends on floor-to-floor height and ceiling void depth; without early dimensions, redesign is almost inevitable.

02

Safety margins inflate the budget

Calculations based on catalogue equipment and generic coefficients often oversize plant and equipment.

03

Cold in winter, noisy in summer

If load profiles and part-load behaviour are not modelled correctly, comfort complaints start before commissioning.

FAQ

VRF or chiller?

The choice depends on part-load profile, maintenance access, and plant room space; there is no single right answer for every project.

Is heat recovery worth it?

We assess it against the operating profile and outdoor air rate; energy savings and upfront cost are reviewed together.

Can you audit an existing system?

We report on capacity, balance, and maintenance access from site measurements, equipment nameplates, and existing drawings.

Process

01

Survey and existing conditions review

02

Concept and system selection

03

Detailed design and cross-discipline coordination

04

Permit documents and official approvals

05

Tender documentation support

06

Construction-phase technical support

07

Commissioning and testing

08

Handover and as-built documentation

Quote request

Leave your phone number; the relevant division will contact you.

+995 591 558 585WhatsApp · +995 591 558 585