Handing over fire systems: the document list

What the commission asks for

The design, installation records, material certificates and test protocols. We assemble the list back at detailed design stage.

Cause and effect

The description must exist as text and as a table: which detector starts and stops what. That reduces the number of comments.

Staff instruction

A short document: alarm list, actions and contacts.